Depending on the span you ll need at least a 2 by 8 joist under foot for flooring.
Framing an attic closet.
In closets where the ceiling slopes very close to the floor or the knee wall is very short low shelving can often be installed along the walls behind the hanging areas.
Do not add insulation between heated spaces.
Low shelving is installed behind the hanging areas to maximize all possible storage space.
Use a framing square to make sure this will be perfectly perpendicular to the front wall.
Cut 2 x 4s to the fit the length and width of the plywood and nail them flat on all four edges of the plywood as a base plate for the studs.
If the closet has a side wall return lay out the top plate and sole plate in the same way.
If you want your attic space to have a flat ceiling you ll need to add collar ties to the framing.
It s just a matter of framing the knee wall the short part of the wall and the slanted ceiling.
Make sure the joists in the attic are suitable to carry weight.
Most attic ladders are made to fit between joists set at 24 inches on center.
Often times with sloped ceilings you need to think outside the box when it comes to a storage closet.
Mark the top plate and the sole plate together for stud locations using a square and a pencil.
We worked from 8am until 4 15 and got the bulk of the closet built.
Cut each sole plate and top plate to the desired length.
A slanted wall closet while not ideal is better than no closet at all.
Decide on the size of floor and remove insulation from between joists in that area.
Collar ties are horizontal members that like rafter ties extend from rafter to rafter but.